IVA International original logoIVA InternationalLuxury Surface Atelier

Buyer confidence and project clarity

Technical Specifications

A quotation is only as reliable as the information behind it.

IVA workflow

Six checkpoints that reduce avoidable surprises.

Technical planning information required for IVA stone cladding, CNC panels, tile highlighters and epoxy product enquiries.

  1. 01

    Wall or product dimensions

    Confirm the application, dimensions, design intent, quantity, project location and required timeline.

  2. 02

    Application and environment

    Review whether the proposed material, format, finish and design can be manufactured responsibly.

  3. 03

    Substrate and fixing responsibility

    Approve the relevant physical or visual control before production release.

  4. 04

    Panel sizes, joints and numbering

    Coordinate joints, modules, artwork, panel codes, hardware or product dimensions as applicable.

  5. 05

    Material, finish and approval sample

    Manufacture against the approved control documents and agreed natural-variation parameters.

  6. 06

    Quantity, location and required timeline

    Inspect, number, protect and prepare the order for the agreed delivery route.

What IVA will not do

Promise certainty without project information.

Website images alone cannot confirm material suitability, structural fixing, exact colour, final dimensions, price or delivery. These are established through the enquiry, approval and quotation process.

For current factory evidence, production videos, packing references or a visit request, contact IVA directly. We will not present an invented showroom or an AI-generated factory as proof.

WA